Road infrastructure damaged by flooding in Shabran district restored
RH
In Shabran district, the restoration and reconstruction work on two motorways damaged as a result of heavy downpours and a strong flood has been completed in full. At the initiative of the State Agency, the road surface was renewed in various sections of the Düzbilici–Vələsi–Çinarlar route, a drainage pipe was installed, and two new bridges were built. In parallel, a modern drainage facility was put into operation at the 6th kilometer of the Shabran–Qalaaltı highway.
Postxronika.az reports with reference to the AAYDA that, as a result of the measures taken, the consequences of the natural disaster were fully eliminated and safe, smooth traffic was restored. The restoration works were carried out promptly on the basis of a relevant Order of the President of the country. The work carried out prevented the interruption of transport links in the area and ensured greater mobility comfort for local residents.
The rapid elimination of damage caused by natural disasters reflects the high level of attention the state pays to maintaining road infrastructure. Rebuilding drainage systems and bridges will make it possible to minimize the consequences of floodwaters that may occur in the future. The renewed transport lines will ensure the safe arrival of residents of the region to their homes.